Aufgabe HT 3 · Abitur NRW Geographie GK · Haupttermin · bilingual Englisch 2021
Thema: Wachstumsimpulse durch Großprojekte und Infrastruktur · Aus der Prüfung GK · Haupttermin · bilingual Englisch (2021)
Aufgabenstellung
Abiturprüfung 2021 – Geographie bilingual-englisch, Grundkurs
Topic: Expanding Infrastructure as a Trigger for Sustainable Development? – Case Study: Stiegler's Gorge Dam Project, Tanzania
Materialgrundlage
Doc. 1: Atlas – Maps of Your Choice
Doc. 2: Tanzania – Socio-Economic Data
Doc. 3: Tanzania – Physical Map
Doc. 4: Tanzania – Precipitation
Doc. 5: Tanzania – Forecast: Electricity Generation and Electricity Demand
* total electricity consumption 2019 = 100.
Note: Grid losses refer to the difference between the amount of electricity which is generated and the amount of electricity which is actually used. Grid losses in Central Europe amount to approx. 6 %.
Doc. 6: Stiegler's Gorge Dam Project – Facts and Figures
Doc. 7: Tanzania – Electricity Grid
Doc. 8: Tanzania Development Vision 2025 (published in 2016)
The Tanzania Development Vision 2025 envisages Tanzania becoming a middle-income country [...] by 2025, an objective which will [...] require an increase in GDP per capita to US$ 3,000 in 2025. Achieving this goal makes rapid economic growth necessary, driven by a sufficiently available, reliable, affordable and environmentally friendly power supply. Therefore, electricity generation capacity needs to be increased from 1,583 MW to at least 10,000 MW by 2025.
Assignments
1.
Locate Tanzania and characterize the country's state of development. (22 Punkte)
2.
Illustrate how suitable the Rufiji Basin is for generating hydroelectric power, and how the Stiegler's Gorge Dam Project is built and what it aims to achieve. (29 Punkte)
3.
Comment on the question posed in the topic. (29 Punkte)

Lösung
Nach den offiziellen Korrekturhinweisen
1. Locate Tanzania and characterize the country's state of development. (22 Punkte)
Lösung: Comprehensive geographical localization of Tanzania and socio-economic characterization as a developing country / LDC.
2. Illustrate how suitable the Rufiji Basin is for generating hydroelectric power, and how the Stiegler's Gorge Dam Project is built and what it aims to achieve. (29 Punkte)
Lösung: Illustration of the physical/natural potential and limiting factors of the Rufiji Basin, alongside project history, technical layout, and developmental objectives.
3. Comment on the question posed in the topic. (29 Punkte)
Lösung: Critical assessment and discussion of whether the Stiegler's Gorge Dam project represents sustainable development or primarily a top-down growth strategy with severe socio-ecological trade-offs.
Die ausführliche Erklärung Schritt für Schritt (mit KI) gibt es mit Premium. Premium
Löse sie direkt hier: automatische Korrektur, Hinweise und Lösung Schritt für Schritt.
‹ Aufgabe 3 · GK · Haupttermin 2021 · Aufgabe 3 · LK · Haupttermin · Weiterbildungskolleg 2021 ›
Mehr Aufgaben zu Wachstumsimpulse durch Großprojekte und Infrastruktur
- Aufgabe 1 · GK · Haupttermin 2022
- Aufgabe 3 · GK · Haupttermin 2022
- Aufgabe HT 1 · GK · Haupttermin · bilingual Englisch 2022
- Aufgabe HT 3 · GK · Haupttermin · bilingual Englisch 2022
- Aufgabe 3 · GK · Haupttermin 2021
- Aufgabe 3 · LK · Haupttermin · Weiterbildungskolleg 2021
- Aufgabe 3 · LK · Nachtermin 2021