Aufgabe HT 1 · Abitur NRW Geographie GK · Haupttermin · bilingual Englisch 2021
Thema: Stadtentwicklung und Stadtumbau · Aus der Prüfung GK · Haupttermin · bilingual Englisch (2021)
Aufgabenstellung
Abiturprüfung 2021 · Geographie bilingual-englisch, Grundkurs
Topic: Revitalisation of Brownfield Sites in the Context of Sustainable Urban Development – Case Study: Västra Hamnen in Malmö, Sweden
Materialgrundlage
Doc. 1: Atlas – Maps of Your Choice
Doc. 2: Malmö and Västra Hamnen – Location
Doc. 3: Malmö and Västra Hamnen – General Information
Doc. 4: Malmö – Population and Housing
Doc. 5: Malmö – Economy
Doc. 6: Västra Hamnen 2002 / 2018
Doc. 7: Västra Hamnen – Facts and Figures
Doc. 8: Västra Hamnen and Malmö – Social Structure
Doc. 3: Malmö and Västra Hamnen – General Information
third largest city in Sweden, after Stockholm and Gothenburg
until the 1980s: important location for shipbuilding
end of the 1980s: closing of Kockums wharf, the largest employer in Malmö
end of the 1990s: the City of Malmö purchases the derelict land of the former wharf and makes plans for the new district of Västra Hamnen
1998: founding of Malmö University; today 24,000 students and 1,800 employees
2000: opening of Øresund Bridge; today Malmö is the Swedish centre of the Øresund Region, the most important economic region in the Baltic Sea Region
2001: international ecological housing exhibition (Bo01) in western part of former wharf site
1970 · 1980 · 1990 · 1995 · 2000 · 2005 · 2010 · 2015 · 2018 · Forecast 2030
263 · 229 · 224 · 233 · 247 · 257 · 278 · 300 · 315 · 354
Population (thousand)
* Most of the new jobs were created in business consulting, IT and data security as well as in the hospitality industry. The Øresund Region is known as the largest IT cluster in Europe.
** Most of the newly founded companies were established in advertising and marketing as well as in the trade sector. Västra Hamnen is a popular location for start-ups owing to its proximity to the university.
Doc. 7: Västra Hamnen – Facts and Figures
construction of new urban district (area: 175 ha) for 10,000 to 12,000 persons and providing facilities for 10,000 employees as well as for 10,000 university students
eco-neighbourhood Bo01 powered by 100 % local renewable energy (wind, solar, biogas from domestic waste); electricity mainly generated using wind and solar energy; heating with solar collectors (covering 15 % of annual heat demand) and heat pumps; ground- and seawater used for cooling
extensive urban green space, artificial streams, fountains and ponds
traffic management: 35 km of play streets and pedestrian zones; cycle path network of more than 8 km; cars either forbidden or allowed at low speeds
one parking space available per household; environmentally friendly vehicles with electric or hybrid drive provided with parking space directly in front of the house
1.
Locate the city of Malmö and its district Västra Hamnen. Characterize how Malmö developed economically and demographically up to the end of the 1990s and the challenges that arose from this. [24 Punkte]
2.
With reference to this context, illustrate how the district of Västra Hamnen has developed. [28 Punkte]
3.
Assess to what extent the district of Västra Hamnen has put the concept of sustainable urban development into practice. [28 Punkte]

Lösung
Nach den offiziellen Korrekturhinweisen
1. Locate the city of Malmö and its district Västra Hamnen. Characterize how Malmö developed economically and demographically up to the end of the 1990s and the challenges that arose from this.
Lösung: Locational analysis, economic/demographic trends until late 1990s, and urban challenges.
2. With reference to this context, illustrate how the district of Västra Hamnen has developed.
Lösung: Analysis of the brownfield redevelopment process, citywide context, and socioeconomic significance.
3. Assess to what extent the district of Västra Hamnen has put the concept of sustainable urban development into practice.
Lösung: Comprehensive assessment covering ecological, social, and economic dimensions of sustainability with a reasoned judgment.
Die ausführliche Erklärung Schritt für Schritt (mit KI) gibt es mit Premium. Premium
Löse sie direkt hier: automatische Korrektur, Hinweise und Lösung Schritt für Schritt.
‹ Aufgabe 1 · GK · Haupttermin 2021 · Aufgabe 1 · GK · Haupttermin · Weiterbildungskolleg 2021 ›
Mehr Aufgaben zu Stadtentwicklung und Stadtumbau
- Aufgabe 3 · GK · Nachtermin 2022
- Aufgabe 4 · LK · Haupttermin 2022
- Aufgabe 4 · LK · Haupttermin · Weiterbildungskolleg 2022
- Aufgabe 1 · LK · Nachtermin 2022
- Aufgabe 1 · GK · Haupttermin 2021
- Aufgabe 1 · GK · Haupttermin · Weiterbildungskolleg 2021
- Aufgabe 2 · LK · Haupttermin 2021
- Aufgabe HT 2 · LK · Haupttermin · Weiterbildungskolleg 2021